Analisa Pengujian Kelayakan PMT 150 kV Bay Mandirancan I Berdasarkan Parameter Breaker Analyzer di Gardu Induk Sunyaragi

The Analysis of PMT 150kV Mandirancan I Reliability Test Based on Breaker Parameter at Sunyaragi Transmission

  • Adis Galih Firdaus Universitas Singaperbangsa Karawang
  • Rahmat Hidayat Universitas Singaperbangsa Karawang
Keywords: Electric Power Transmission, Circuit Breaker, Breaker Analyzer, Simultaneous, Motor

Abstract

Electricity is an energy that is very important in all aspects of people's life. PT. PLN (Persero) as a provider and supplier of electrical energy in Indonesia, is absolutely required to supply electricity to the community properly. One of the efforts to do this is to ensure the appropriateness and reliability of the equipment used in the electric power transmission system by carrying out routine testing and maintenance. The equipment that plays a vital role in the electric power transmission system is the Circuit Breaker (CB) because it functions as a mechanical switch used to cut off the flow of the load current which plays an important role when a disturbance occurs to protect other equipment from damage. Therefore, the reliability of this CB must always be maintained. In this study, tests were carried out four times on the CB 150 kV Mandirancan I contacts by measuring the synchronization of working time for open, close, reclose, and OCO (Open - Close - Open) contacts using a Breaker Analyzer measuring instrument. The test results show an anomaly in terms of the synchronization of the contacts, where one of the contacts works faster when it closes due to the longer pull of the motor than the other contacts. To overcome this, it is recommended to reset the Motor Run Limit Switch PMT so that the length of time the motor works is similar in all of its contacts.

Downloads

Download data is not yet available.

References

[1] D. Aribowo et al., “Analisis Hasil Uji PMT 150 kV pada Gardu Induk Cilegon Baru BAY KS 1,” pp. 59–65, 2018.
[2] A. S. Pambudi, “Pengujian Keserempakan Pemutus Tenaga (PMT) Three Pole 150 kV Bay Trafo Gardu Induk Simulator Udiklat Semarang (TLM Academy),” J. Tek. Elektro, p. 4, 2014.
[3] P. Nur and B. Winardi, “PENGUJIAN KESEREMPAKAN PEMUTUS TENAGA (PMT) 20 KV DI GARDU INDUK 150 kV PURBALINGGA PT.PLN (PERSERO ),” no. 024, pp. 1–8, 2018.
[4] E. YULIANTO, “Pengujian Keserempakan Pemutus Tenaga 150 kV di Bay Cep 1 Dan 2 Gardu Induk Sunyaragi PT. PLN (Persero) APP Cirebon,” 2017.
[5] A. Goeritno, S. Rasiman, and Z. Komara, “Kinerja Pemutus Tenaga Tegangan Tinggi Bermedia Gas SF6 Berdasarkan Sejumlah Parameter Diri,” Eeccis, vol. 12, no. 2, pp. 104–111, 2018.
[6] S. Robaga, A. Setyo, I. Samsu, and E. Al, “Buku Pedoman Pemeliharaan Pemutus Tenaga,” PT. PLN, pp. 1–61, 2009.
[7] R. L. Imani, S. Suprijadi, and A. Siswanto, “ANALISIS HASIL OVER HOUL PEMUTUS TENAGA (PMT) 70KV PADA BAY ARJAWINANGUN 2 DI PT PLN PERSERO APP CIREBON GI KADIPATEN,” Conf. Innov. Appl. Sci. Technol., vol. 1, no. 1, pp. 618–625, 2018.
[8] Vanguard, “Operating Instructions for the CT-6500 Series 2,” 2008.
[9] Alstom, “Operating Instructions No . 195 A ( EN ),” vol. 248, no. 195, pp. 1–128, 2005.
[10] PT. PLN (Persero). 2014, Buku Petunjuk Gardu Induk, SE No.0520-2.K/DIR/2014, PT. PLN (Persero), Jakarta.